CASE STUDIES

Project Management of Protection Settings Upgrade

Large scale Active Harmonic Filtering for Bio Pharma site.

Variable Speed Drives Overload

UPS Failure – Biotechnology Plant

Project Management Of Arc Flash Mitigation

Pharma – Utility Monitoring And Power Quality

MSD Ballydine – Electrical Safety Intergradation

Mallinckrodt Pharmaceuticals – Switchgear Upgrade

Gilead Sciences – Power Monitoring System

Generator Feasibility Study

Elevated Harmonics Levels

Bio Pharma – Energy Efficiency And Power Quality

World Renowned Data Centre – UPS Malfunction

Power Studies For Data Center Grid Connection Approval

Harmonic Modelling For Grid Connection

Arc Flash Programme – Global Data Centres

Arc Flash Hazards & Risk Assessment – Gas Turbine Power Station

Arc Flash Risk Measurement & Reduction At A Power Station

ESB Networks – Grid Power Quality Solution

Electrical Safety And Maintenance Review – Kinsale Energy LTD

Bio Pharma Reliability Study

EMC Corporation – Arc Flash Study

Harmonic Distortion And Lower Energy Costs – Athlone Extrusions

Parker Pneumatics – Electrical Safety Programme

Arc Flash Analysis On A Wind Farm

Wind Energy Connections – Cork Lower Harbour Energy Group

Protection & Safety At A Beverage Plant

Glanbia – Harmonics Mitigation

Dairy Processing – Hybrid Solutions To Harmonics Issues

Earthing Studies

Pepsico – Power Reliability

Power Quality During An Electrical Expansion With A Manufacturer

Windfarm Harmonics & Connection Compliance

Data Centre Build – Grid Connections Studies

Maximising Investments in Energy Monitoring Systems

NEED A SAFE, MORE RELIABLE AND COST
EFFECTIVE ELECTRICAL SYSTEM?

Speak to one of our expert engineers today.

MAKE AN ENQUIRYWHAT WE DO