Colorful Five Circle Process Timeline Graph (1600 × 1000 px) (1600 × 1200 px) (2000 × 1200 px) (1)

SERVING THE PHARMACEUTICAL SECTOR SINCE 2001

Since 2001, we have been advising our customers on how best to manage their electrical systems to meet the demands of the processes it supplies. Working together, our engineers can integrate into your organisation and develop solutions to solve your most technical needs. By carrying out a number of specialised studies we can advise on a system that can deliver the best outcomes for you now and long into the future.

Some of our most popular solutions include:

  • Load Flow & Short Circuit
  • Power Quality
  • Arc Flash Analysis
  • Safety Training
  • Power Factor Correction
  • Power Monitoring Systems
  • Feasibility Studies

ARC FLASH ANALYSIS

Arc flash incidents can cause serious harm to electrical workers and damage valuable equipment on site. Our team of highly trained engineers are experienced in conducting Arc Flash Hazard Analysis, Arc Flash Studies, Arc Flash Mitigation solutions and specialised Arc Flash Training. We work with all size facilities across many industries to introduce and maintain Arc Flash safety.

Using proven software tools, our engineers calculate the prospective arc incident energy levels along electrical networks. Armed with this data, they assess the risks and identify the preventative and protective measures necessary to protect workers, electrical infrastructure and processes.

Learn More

POWER SYSTEM MODELLING

Our team of experienced electrical and power system engineers use ETAP and SKM modelling software to construct a digital twin replica of your electrical network in order to optimise the design, simulation, monitoring, control, and automation of your power system. Depending on the outcomes or information you require we can conduct any number of the specialised studies we offer.

POWER MONITORING SYSTEMS

Large scale facilities have come around to the benefits of incorporating power monitoring systems as part of their process control as well as the standard building management systems. We can work with you to get the best from your power monitoring system, commissioning and verifying the energy and power systems for compliance with EN 16247-1 for energy audits.

Premium Power are one of few companies to achieve the coveted EcoXpert Master Partner status from Schneider Electric for our Critical Power systems and solutions. Receiving this certification demonstrates our expertise in designing and deploying of energy management systems, implementing advanced metering networks, power quality management and world-class software tools to assist large and critical sites manage energy costs, improve the reliability of their electrical systems and optimise equipment performance.

Learn More

SAFETY TRAINING

We have developed our courses in response to the changing corporate demands of large facilities and the needs of their employees. Offering full day or half day courses we can tailor our courses to deliver training in line with your facility’s particular needs.

As registered training providers with Engineers Ireland and CPD we can issue certificates of completion and CPD points on all our courses.

Pricing for our courses is based on 12 delegates, anything over this number can be priced separately.

Learn More
solar panels
case study

The client came to us with a requirement to see the output their onsite solar panels were producing and where that power was being used.

gilead
case study

A network of high-end metering devices was set up around the site to monitor and analyse energy usage.

protection settings
case study

Upon completion of a Protective Device Coordination study, we were tasked with project managing the implementation of the proposed settings on the MV relays and main LV incomers to enhance reliability.

msd ballydine
case study

MSD Corporate electrical Safety provide general guidelines for conducting electrical work in a safe and controlled manner. The guidelines are issued to all MSD facilities globally. We assisted to localise the guidelines and to adapt the health and safety requirements specifically to Ballydine facility operations.

harmonicss
case study

We prevented damaging downtime caused by elevated harmonics levels at a large pharmaceutical plant in the West of Ireland.

previous arrow
next arrow

NEED A SAFE, MORE RELIABLE AND
COST EFFECTIVE ELECTRICAL SYSTEM?

Speak to one of our expert engineers today.

MAKE AN ENQUIRYWHAT WE DO