We develop a maintenance strategy suitable for the upkeep of electrical equipment in a particular facility and application. Maintenance intervals and tasks are recommended to ensure that both the MV and LV equipment will facilitate your needs with an effective and reliable electrical system. Based on a combination of inputs from qualitative and quantitative data from our site survey, we can determine a maintenance schedule that captures any missing issues while streamlining existing activities.
MAINTENANCE STRATEGY
A reliable plant is a safe plant. We work with our clients to help develop a maintenance strategy and schedule for electrical works. We also advise on the latest industry updates and can organise to implement or repair the network where needed.
OUR MAINTENANCE STRATEGY INCLUDES
Our maintenance gap analysis service takes into account your unique needs and involves a combinations of services like:
- Equipment condition assessment
- Equipment criticality assessment
- Reliability centered maintenance
- Condition based maintenance
- Maintenance schedule
- Streamlining existing schedules
FEATURED CASE STUDY
Mallinckrodt Pharmaceuticals - Switchgear Upgrade
We were retained by the Client to provide a full EPCM package that would solve the issues observed. Premium Power developed a tender package and issued it to three pre-approved switchgear manufacturers. The competitive tendering process ensured that the project costs were minimised for the client. On award of the project to the winning switchgear manufacturer, we project managed the entire process during a very short facility shut-down period. We successfully managed the construction process, completed commissioning and successfully handed back the facility to the client on time and on-budget.
”“We diagnosed the issues, designed the solution, project managed the construction, commissioned the systems and successfully handed back the system to a happy client in time for operations to resume at the facility. The tight timeframe for conducting these works meant that we had to have a hands on approach to ensure that the schedule was met.”
Michal SopockoEngineering Director