Power Studies for Datacentre Grid Connection Approval

Premium Power worked directly with a global multinational datacentre client developing comprehensive power system models to comply with local TSO grid connection requirements.

Client
Multinational Datacenter
Size
70 MW Facility
Key Result
Comply with local TSO Requirements

The Challenge

Our confidential datacentre client with a rapidly growing fleet of facilities was looking to connect a 70 MW facility to the 110-kV transmission system. Premium Power were tasked with carrying out power quality analysis (harmonics & transformer inrush) at the sites 220 kV PCC to ensure full compliance with the grid requirements. The project also includes power systems analysis (short circuit, protection coordination and arc flash analysis) within the client’s facility to ensure optimum reliability and safety in all fault conditions.

How We Helped

Premium Power developed comprehensive power systems models using two different software types, DIgSILENT (PQ analysis) and SKM (power systems analysis). The project was delivered in two stages;

  1. PQ analysis using DIgSILENT to identify VTHD at the 220 kV PCC. The PQ analysis was also used to assess the grid transformers/grids response during transformer start up.
  2. Power systems analysis; short circuit calculations were used to assist in the design of both MV & LV protection schemes. Following this prospective arc incident energies were calculated for all 3-phase equipment types.

The Result

The PQ analysis showed that the Client was 100% complaint with the requirements set out by the TSO (transmission system operator). This meant there were no delays in grid transformer energisation, which in turn meant the Client was on course to delivering power to the critical load on schedule.

The power systems analysis meant the protection schemes were designed to achieve a reliable and safe electrical system – the settings were designed to ensure prospective arc incident energies were minimised while achieving optimum grading on site.

Recent News & Events

arc-flash-risk-assessment-ppe

What is Arc flash and how to avoid it

Arc Flash An Arc Flash is an explosive release of energy caused by an electrical short circuit between two energised conductors or an energised conductor and earth. The discharge of ...

Read More

Electrical Engineering Careers Fair

We will be at the Electrical Engineering Careers Fair at Technological University Dublin (DIT) on Monday the 18th of November. The event is taking place in Gleeson Hall at the ...

Read More
2020 with loading bar

Round up of 2019

As 2019 draws to a close why not take a look back on everything that has been a topic of discussion during the year. Blogs and articles Throughout the year ...

Read More

Please activate some Widgets.

What We’ve Done